top of page

Nitschmann Middle School

Bethlehem, PA

New Construction: 185,000 sq ft 

Hours: 1,400

Project Characteristics

  • Attempting LEED Platinum certification 

  • Four stories

  • Auditorium, Two Gymnasiums, Cafeteria, Music Suite, Technical Education & Engineering Labs, Art and Kiln Rooms, Open Collaboration Alcoves

  • Daylight harvesting through architectural elements and responsive lighting systems

  • Level 3000 BIM 

​

Responsibilities 

  • 3D Modeling for design studies including massing, fenestrations, and finishes. 

  • Detailing - elevations, millwork, and design details

  • LEED documentation and managed successful integration of all sustainable design requirements. 

  • Participated in value engineering studies, discussion, and further design development. 

Software

ArchiCAD 

Artlantis

BIMx

Photoshop

All content on this site is the property of Anne Lebo except where otherwise noted. Photos and/ or drawings that are the sole copywright of an incorporated business are not to be copied or reproduced in any fashion or for any purpose without express permission from the owner. 

Copyright 2019 Anne Lebo. No college students were harmed in the making of this site.

bottom of page