top of page

Newtown Middle School

Newtown, PA

New Construction: 190,000 sq ft 

Hours: 1,600

Project Characteristics

  • Attempting LEED gold certification 

  • Two story design with courtyard to maximize daylight harvesting

  • Level 3000 BIM

  • Office suites, Auditorium, Music suite, Prototype Lab and Art Suite, Fitness Center, Two Gymnasiums, and Library and Technology suite

  • Music and arts wing across from library and classroom wing

​

Responsibilities 

  • Department design - classrooms, suites, and offices

  • 3D modeling studies for massing, finishes, and colors

  • Documentation and detailing of design, particularly elevations of all classrooms and common areas. 

  • Developed language of common collaboration spaces that is the focal point of the corridor system. 

​

Software

ArchiCAD 

Artlantis

BIMx

Photoshop

​

All content on this site is the property of Anne Lebo except where otherwise noted. Photos and/ or drawings that are the sole copywright of an incorporated business are not to be copied or reproduced in any fashion or for any purpose without express permission from the owner. 

Copyright 2019 Anne Lebo. No college students were harmed in the making of this site.

bottom of page